What is an AS9102 FAI?

What is an AS9102 FAI?

This SAE Aerospace Standard (AS) establishes documentation requirements for the First Article Inspection (FAI). The purpose of this standard is to provide a consistent documentation requirement for aerospace components First Article Inspection. …

What are the differences between AS9102 Rev A and Rev B?

The major difference from AS9102 Rev A to Rev B is that Rev B includes Digital Product Design (DPD). When design requirements are in DPD format and 2D drawing information is not available for all applicable design requirements, DPD design characteristics shall be extracted verified, and included in the FAIR.

What is a partial FAI?

What is Delta FAI? A Delta FAI, or partial FAI, is done when there is a change in the manufacturing process. A partial or Delta FAI is required when: A change in design potentially affects form, fit, or function. A change in manufacturing source, process, inspection method, location of manufacture, tooling, or material.

What is FAI in aerospace?

First Article Inspection (FAI) is the process of planning, manufacturing, and verifying a production process. In the aerospace and defense industries in the US, most companies conduct AS9102 First Article Inspections.

What does FAI stand for in manufacturing?

First article inspection
First article inspection (FAI), a process shared across nearly every type of manufacturing industry in the world, allows suppliers to formally report measurements of the initial part manufactured in cooperation with a customer who reviews and approves it.

How many forms are needed in an AS9102 report?

three forms
What are the three forms of an AS9102 FAIR? There are 3 forms in AS9102 FAIRs – Part Number Accountability, Product Accountability, and Characteristic Accountability.

Does ISO 9001 require first article inspection?

Does ISO 9001 require first article inspection? ISO 9001 does require that you have your operational processes defined and controlled; however, the very specific requirement to perform and record the inspection of an article from the first production run is not included as a required verification process.

What is ISO AS9100?

AS9100 is a widely adopted and standardized quality management system for the aerospace industry. AS9100 replaces the earlier AS9000 and fully incorporates the entirety of the current version of ISO 9001, while adding requirements relating to quality and safety.

What is the difference between FAI and PPAP?

PPAP (Production Part Approval Process) is a mandatory process in the automotive industry, and is designed to assess the manufacturability of the supplier to fulfill customer quality requirements. FAI (First Article Inspection) is the aerospace equivalent of the PPAP and is also called initial quality control.

What is the purpose of FAI?

The purpose of a FAI report include the following: The FAI report provides a guideline to provide objective confirmation that all engineering design and specification requirements are correctly understood, accounted for, verified and documented. Ensure the production process is reliable, repeatable and consistent.

What does FAI stand for?

first article inspection
A first article inspection (FAI) is a design verification and design history file and a formal method of providing a reported measurement for each manufactured feature of a part or assembly. Typically the supplier performs the FAI and the purchaser reviews or approves the report.

What is FAI in English?

Football Association of Ireland. Collins English Dictionary. Copyright © HarperCollins Publishers. Word origin. (sense 2) French: International Aeronautical Federation.

What is the purpose of the AS9102 FAI Standard?

The AS9102 Standard establishes documentation requirements for the First Article Inspection (FAI). The purpose of this standard is to provide a consistent documentation requirement for aerospace components First Article Inspection. Some customers also flowed down the AS9102 requirements to non-aerospace parts as well.

How to use first article inspection training AS9102?

1 First Article Inspection Training AS9102, rev B Proprietary The information contained herein is proprietary to JAMCO Corporation and shall not be reproduced or disclosed in whole or in part or used for any reason except when such user possesses direct, written authorization from JAMCO. 2

Can a FAI requirement be invoked after initial compliance?

The FAI requirement, once invoked, shall continue to apply even after initial compliance. b. The FAI requirements may be satisfied by a partial FAI that addresses only the changes from a baseline part number provided all other characteristics were conforming on the previous FAI and are produced by the original production processes. c.

Can a FAI be completed with an assembly fair?

Detail-Part FAIs and Assembly FAIRs must be completed independently, with their own complete individual FAI package. (see exception) Exception: A scenario may exist whereas the engineering does not define the manufactured detail-part as an unique part/dash number, separate from the assembly.